Contact Us
If you have a commercial, industrial, infrastructure or heritage structural repair enquiry, contact us now. We will respond within one working day. Please note we do not provide services for domestic properties.
Business enquiries:
When a concrete structure fails – whether it is the seawall of a historic dry dock, the support pier of a motorway flyover, or the deck of a multi-storey car park – the visible symptom is almost always the same: cracked, spalling concrete and exposed, rusting steel.
However, the true danger does not start when the concrete falls. It begins decades earlier, silently and invisibly, driven by a relentless chemical attack known as chloride-induced corrosion.
Across the civil and commercial engineering sectors, chlorides are the undisputed ultimate enemy of reinforced concrete. At Structural Repairs, we encounter this specific pathology daily. To understand why infrastructure requires specialist structural concrete repair, asset managers must first understand the aggressive mechanics of the chloride threat.

The Öresund Bridge between Denmark and Sweden suffers constant chloride-based attacks from sea air and water and salt-gritting of the carriageways in winter.
When a general contractor sees spalling concrete, their instinct is to chip away the loose debris and fill the hole with a standard mortar patch. When dealing with chloride-induced corrosion, this is a disastrous mistake.
Standard patching traps the active chlorides and rusting steel inside the structure. Worse, the new, highly alkaline patch changes the electrical potential of the surrounding concrete. This creates a powerful electrochemical reaction known as the incipient anode effect, which rapidly accelerates the corrosion in the unpatched steel immediately adjacent to the repair.
Within months, the concrete next to the new patch will blow off, trapping the asset owner in an expensive, never-ending cycle of failing cosmetic repairs.

Cosmetic repairs to chloride-based corrosion will always fail quickly and can accelerate catastrophic corrision.
Halting chloride-induced corrosion requires an engineering-led, multi-stage intervention.
Chloride-induced corrosion is a terminal disease for reinforced concrete, but it can be permanently arrested if caught and engineered correctly. Do not rely on cosmetic patches to secure your critical infrastructure.
Contact the specialist engineering team at Structural Repairs today to arrange a comprehensive NDT survey and secure the future of your assets.