Emergency Propping in Haringey

This property, a factory unit located in Haringey, London, was originally built on an inadequate foundation which caused the problems we were called out to identify and find solutions for.

Project Details:

Completion Date: 2019

Project Type: Emergency Propping, Gable

Solutions: Propping Construction & Repair, Gable Repair

Location: Haringey, London 

The Problem

This factory unit, which was originally built on an inadequate foundation, was found to hold a plethora of structural problems. The whole building had been affected by the inadequacy of its foundations which rendered it completely unsafe and made it suffer from an extensive amount of structural movement.

The Solution

As a means to solve the grave problems we identified, we underwent emergency propping work, took down the old gable and rebuilt it completely. In all we ended up installed new and improved foundations which were built to a standard which should have been applied to the property when it was first built.

GET YOUR FREE QUOTATION

    Get in touch today
    45 – 46 The Arches, Alma Road, Windsor, Berkshire, SL4 1QZ