Structural Concrete Rehabilitation at Ford Water Treatment Works

Concrete Remediation

The Challenge

Structural Repairs was appointed by GEL Engineering to undertake critical concrete repairs within the primary distribution chamber at Ford Water Treatment Works. The active chamber required immediate remediation of deteriorated reinforced concrete surfaces prior to a scheduled stop log installation.

Because the chamber remained fully operational outside the isolated repair zone, preventing debris, dust, spray rebound and wash water from contaminating the live process water was a primary operational constraint. The highly corrosive sewage environment also necessitated strict safety protocols to manage biological hazards, alongside the logistical complexities of working at height from a Mobile Elevating Work Platform (MEWP) during night shifts.

ClientGEL Engineering
LocationFord WTW, Arundel
SectorWater Infrastructure
Duration2–3
Core ServicesStructural breakout,
specialist containment, reinforcement protection,
wet-spray structural mortar application

The Structural Repairs Solution

Our Wastewater Solutions

Operational Excellence

The project was executed entirely during planned night shifts to minimise disruption, with all works conducted from a safely positioned MEWP to avoid confined space entry. By isolating the work zone with a custom containment system and utilising advanced composite mortars, Structural Repairs successfully restored the structural integrity and extended the operational life of the primary distribution chamber without interrupting the facility’s vital water treatment processes.