Contact Us
If you have a commercial, industrial, infrastructure or heritage structural repair enquiry, contact us now. We will respond within one working day. Please note we do not provide services for domestic properties.
Business enquiries:
At Structural Repairs Ltd, we are proud to announce the successful completion of another critical RAAC repair project (Reinforced Autoclaved Aerated Concrete) , this time on essential infrastructure for Network Rail.
This project highlights our expertise in identifying, analysing and repairing RAAC defects using our proprietary
ReInforcer Mesh structural strengthening system – delivering permanent remediation with minimal disruption.
Maintaining the structural integrity of the national rail network is an uncompromising requirement. During a detailed structural assessment of a critical Network Rail asset, our engineers identified multiple severe defects within the existing RAAC planks.
Left unchecked, these defects posed a severe risk to the integrity of the infrastructure. The assessment revealed:
Given the location and the critical importance of the asset, a traditional rip-and-replace approach was unfeasible. The client required a rapid, highly accurate and permanent structural intervention that would not disrupt the active transport network.
To rectify the defects without halting rail operations, we deployed the advanced ReInforcer Mesh solution – a bespoke, lightweight composite framework engineered specifically for RAAC remediation and strengthening.
Now manufactured entirely in the UK at our dedicated Doncaster hub, our composite solution an immediate and resilient structural upgrade. The key advantages of using this system for Network Rail included:

Our photographic records show the the high-quality finish after ReInforcer Mesh strengthening. These visual outcomes reinforce the success of this project and demonstrate the capabilities of our solutions in real-world, safety-critical environments.
The rail intervention was an overwhelming success. All failing RAAC planks were fully remediated and the structure now meets the most rigorous safety and performance standards.
Crucially, by repairing rather than replacing the infrastructure, this project delivered significant environmental benefits. Avoiding heavy demolition and the installation of traditional steel frameworks drastically reduced the carbon footprint of the project, aligning perfectly with the public sector drive toward net-zero.
Whether you are dealing with ageing RAAC panels or require an urgent structural assessment for critical infrastructure, our engineering teams provide safe, fast and fully certified solutions.