Contact Us
If you have a commercial, industrial, infrastructure or heritage structural repair enquiry, contact us now. We will respond within one working day. Please note we do not provide services for domestic properties.
Business enquiries:
Multi-Storey Car Park 3 (MSCP3) at Heathrow Airport is a high-turnover, landside post-tensioned reinforced concrete structure subjected to continuous vehicle loading and de-icing salt exposure. Condition assessments identified localised cracking, soffit delamination and incipient reinforcement corrosion caused by water ingress and breakdown of the existing deck waterproofing membrane.
Executing structural rehabilitation within an active airport short-stay car park demanded rigorous technical and operational controls:
Structural Repair Solutions planned and delivered a comprehensive, four-phase structural repair, strengthening and waterproofing sequence under full CDM 2015 governance and Point of Work Risk Assessments (POWRA).
Within designated structural strengthening zones (Repair Areas 1 and 2), concrete soffits were grit-blasted with industrial vacuum extraction, degreased with Sika Cleaner P and verified for flatness and pull-off bond strength. Precision grooves were cut to embed Sika CarboDur BC10 carbon-fibre rods alongside externally bonded Sika CarboDur S1012 pultruded plates fixed with Sikadur-30 structural epoxy adhesive.
To prevent future chloride and water ingress on trafficked deck surfaces, operatives applied a rapid-curing PMMA waterproofing system comprising Sikafloor-10 Pronto N primer, fleece-reinforced Sikafloor-32 Pronto base membrane, broadcast kiln-dried silica sand (0.6–1.2 mm) for skid resistance, and a durable Sikafloor-18 Pronto wearing coat overlapped seamlessly into the existing deck membrane.

