Resilience Through Injection
Concrete & Ground Stabilisation
Resin injection and waterproofing are used where concrete structures or ground conditions have deteriorated due to water ingress, porosity, cracking, voiding or settlement. These issues are increasingly driven by climate change and rising groundwater levels.
In concrete, injection eliminates voids, seals cracks, reduces permeability and restores durability. By protecting reinforcement and restoring internal integrity, injection significantly extends asset life without disruptive break-out repairs.
Injection is also used for ground stabilisation and slab lifting. By injecting beneath structures, voids are filled, weak ground consolidated and settled slabs re-levelled without excavation or demolition.
Injection-based solutions are chosen because they are faster, less disruptive and often structurally superior to traditional methods. Structural scanning ensures the correct resin system is selected and applied precisely, with effectiveness verified post-installation. Our engineers design and implement all below-ground waterproofing and resin systems in strict accordance with the codes of practice published by the British Standards Institution.
By rehabilitating existing assets rather than replacing them, resin injection delivers major sustainability benefits and improves resilience to future climate impacts.

Resin Injection Projects

Targeted Water Ingress Remediation for a Multi-National Retailer
The Challenge Following our successful delivery of critical structural remediation for this client’s flagship London site, Structural Repairs was engaged to investigate and resolve widespread, active water ingress at their…

Main Contractor – Hemel Hempstead
Main Contractor Hemel Hempstead Challenging due to its extremely tight access, this project held us as the main contractor while we carried out a successful basement fit and conducted any…

Basement Waterproofing – Fulham
Basement Waterproofing Fulham Our client could hear water running behind their basement walls and the pump chamber activating every 10 minutes. This was a stressful scenario for them as they…