Leighton Buzzard

Structural Cracking

As a new build, this property suffered some light movement which was remedied through crack stitching. As one of our specialities, we were happy to help our client bring this property back to full structural health.

Leighton Buzzard Project

Project Details:

Completion Date: April 2019

Project Type: Crack Stitching

Location: Leighton Buzzard, Bedfordshire

The Problem:

This fairly new Leighton Buzzard build had suffered some light movement which the client wanted to get on top of and ensure the situation didn’t worsen. This type of movement is often a result of alterations or settlement.
Structural Cracking

The Solution:

Given the problem was not severe, it was not deemed bad enough to require underpinning, however, crack stitching was undertaken and the property was successfully brought back to full health.
Structural Cracking
Structural Cracking

Send Us A Message

Contact Info

Call Us

0300 030 1822

Our Email

[email protected]

Our Location

45-46 The Arches, Alma Road,
Windsor, Berkshire, SL4 1QZ

Working Hours

Mon-Fri: 8:30AM-5PM

Scroll to Top